Plumbers Serving Griffith and the Riverina
HOME
PROFILE
PROJECTS
SERVICES
INSURANCES AND REGISTRATIONS
WHS STANDARDS
CONTACT
More
Use tab to navigate through the menu items.
Call 1300 75 7586 OR 1300 PK PLUM
Click here to book your job online
CURRENT BUSINESS SAFE WORK METHOD STATEMENTS AND RISK ASSESSMENTS
Click on headings below and a copy of the PDF file will download for your records.
SAFE WORK METHOD STATEMENTS
RISK ASSESSMENTS
(SWMS) General Plumbing
Drain Cleaning
(SWMS) Working At Heights
Drainage and Stormwater
(SWMS) Mobile Plant (Earthmoving Equipment)
Drainage Systems - Sewerage
(SWMS) Mobile Plant (Working NEAR/Around)
Pre Treatment Waste Systems
(SWMS) Moblie Plant (Vacuum Service Truck)
Sanitary Plumbing
(SWMS) Plumbing-Drain Inspection (CCTV)
Installing Above Ground Rainwater Tanks (light)
(SWMS) Plumbing (Drainage)
Water Jet Blaster
(SWMS) Plumbing (Temporary Services Connection)
(SWMS) Plumbing (Water Jetting Drains)
RETURN TO WHS STANDARDS
(SWMS) Plumbing (Call Out)
PLANT RISK ASSESSMENTS & INFO
(SWMS) Tools Operation (Powered/Non-Powered
(SWMS) Confined Spaces
RETURN TO THE HOME PAGE